PROJECTS OCT - DEC 2017

This customer wanted their bathroom updating whilst they were away on holiday. Work involved the complete removal of the existing floor covering, wall tiles, existing sanitary ware and services. The asbestos contained artex was dealt with and the complete room plaster skimmed. New Led downlights and extract fan. The walls were tiled in porcelain tiles and a contrasting vinyl floor covering laid. ​

After completing a wetroom for a relative this customer decided to have theirs updated too. Work included removal of wall tiles, sanitary ware and floor covering.  The walls were plastered, a wetroom former was installed and the soil drain altered externally. The new wetroom floor was installed and the room tiled. LED downlights and a humidistat controlled fan completed the install. ​

We completed a wetroom installation for a relative a few years prior, this time it was a low level tray with a glass deflector, all new walls tiles and antislip vinyl flooring. ​

A returning customer from earlier in the year. This time it was the en-suite shower room that was remodelled. Work included complete removal of the existing toilet, shower and basin. The walls were plastered and prepared for the new tiles. The walls were tiled and the finishing touches completed with a mirror and lights. ​

Created by Perfect Symmetry